• All Power is Critical, Choose Your Partners Wisely

Electrical Equipment Condition 2

cmag808k3u3v6392lgp2vaatfq-d4df56596bc873818cb3917a461a0665
2023 NFPA 70B 9.3.1.2

Equipment Physical Condition 2 shall be assigned where all the following criteria apply:

9.3.1.2 Equipment Physical Condition 2 shall be assigned where all of 9.3.1.1 apply, and where any of the following criteria apply:

1. Maintenance results deviate from past results or have indicated more frequent maintenance in accordance with manufacturer’s published data.

2. The previous maintenance cycle has revealed issues requiring the repair or replacement of major equipment components.

3. There have been notifications from the continuous monitoring system since the prior assessment.

4. There are active recommendations from predictive techniques.